• Sep 20, 2019 News!IJMMM Had Implemented Online Submission System, Please Submit New Submissions through This System Only!   [Click]
  • Feb 26, 2018 News!'Writing Tips' shared by Prof. Ian McAndrew!   [Click]
  • Mar 23, 2021 News!Vol. 7, No. 2 has been indexed byInspec (IET)!   [Click]
General Information
    • ISSN: 1793-8198 (Print)
    • Abbreviated Title: Int. J. Mater. Mech. Manuf.
    • Frequency: Bimonthly
    • DOI: 10.18178/IJMMM
    • Editor-in-Chief: Prof. Ian McAndrew
    • Co-editor-in-Chief: Prof. K. M. Gupta
    • Executive Editor: Cherry L. Chen
    • Abstracting/Indexing: Inspec (IET), Chemical Abstracts Services (CAS),  ProQuest, Crossref, Ulrich's Periodicals Directory,  EBSCO.
    • E-mail ijmmm@ejournal.net

Editor-in-chief
Prof. Ian McAndrew
Capitol Technology University, USA
It is my honor to be the editor-in-chief of IJMMM. I will do my best to work with the editorial team and help make this journal better.

IJMMM 2013 Vol.1(1): 65-70 ISSN: 1793-8198
DOI: 10.7763/IJMMM.2013.V1.14

Just in Time Strategy in Balancing of Two-Sided Assembly Line Structure

W. Grzechca
Abstract—In this paper a problem of two-sided assembly line balancing problem and Just in Time strategy is considered. Problem of assigning tasks to assembly line is known more than 60 years. Different balances occur in different quality of final results. Smoothness index (SI), time of line (LT) and line efficiency (LE) help to estimate the ends solutions. Additionally detailed idle times are described. In production systems products are assembled in required quantity directly to the market. One of the critical elements in Just in Time strategy is smooth flow production process. Author tries to connect assembly line balancing problem with this strategy. A numerical example is calculated and conclusions are presented.

Index Terms—Assembly line, estimation of final results, just in time strategy, two-sided assembly line structure.

Waldemar Grzechca is with the Silesian University of Technology, 44-100 Gliwice, ul. Akademicka 2A, Poland (e-mail: waldemar.grzechca@polsl.pl).

[PDF]

Cite:W. Grzechca, "Just in Time Strategy in Balancing of Two-Sided Assembly Line Structure," International Journal of Materials, Mechanics and Manufacturing vol. 1, no. 1, pp. 65-70, 2013.

Copyright © 2008-2020. International Journal of Materials, Mechanics and Manufacturing. All rights reserved.
E-mail: ijmmm@ejournal.net